TITLE: FOUNDATION-Unit
DEFICIENCY 1: FOUNDATION IS CRACKED
DEFICIENCY CRITERIA: Crack is present with a width of ¼ inch or greater and a length of 12 inches or greater.
HEALTH AND SAFETY DETERMINATION:MODERATE
CORRECTION TIMEFRAME:                      30 days
HCV Pass / Fail                                             Fail
HCV – CORRECTION TIMEFRAME:           30 days
DEFICIENCY 2 – OUTSIDE: FOUNDATION VENT COVER IS MISSING OR DAMAGED.
DEFICIENCY 3: FOUNDATION HAS EXPOSED REBAR OR FOUNDATION IS SPALLING, FLAKING, OR CHIPPING
DEFICIENCY CRITERIA: The structure has any exposed rebar.
OR
Foundation is spalling, flaking, or chipping and the affected area is 12x12 inches or greater and goes into the foundation at a depth of ¾ inch or greater.
HEALTH AND SAFETY DETERMINATION:MODERATE
CORRECTION TIMEFRAME:                      30 days
HCV Pass / Fail                                             Fail
HCV – CORRECTION TIMEFRAME:          30 days
DEFICIENCY 4: FOUNDATION INFILTRATED BY WATER
DEFICIENCY CRITERIA: Evidence of water infiltration through foundation.
HEALTH AND SAFETY DETERMINATION:MODERATE
CORRECTION TIMEFRAME:                      30 days                                          
HCV Pass / Fail                                             Fail
HCV – CORRECTION TIMEFRAME:          30 days
DEFICIENCY 5 : FOUNDATION SUPPORT POST, COLUMN, BEAM, OR GIRDER is DAMAGED
DEFICIENCY CRITERIA: Any support post, column, or girder area is damaged (i.e., visibly defective; impacts functionality).
HEALTH AND SAFETY DETERMINATION:MODERATE
CORRECTION TIMEFRAME:                      30 days
HCV Pass / Fail                                             Fail
HCV – CORRECTION TIMEFRAME:          30 days
MORE INFORMATION: Foundation Standard